Completed projects

Take a look at some of our work

  • 11 Miles of Dual 12 inch in St. James Louisiana including drilling the Mississippi River south of Baton Rouge LA
  • 96 Miles Smart Tool Run plus cleaning and drying from Corpus Christi to Three Rivers TX
  • 11,300 feet of Dual 14 inch inside GCGV Exxon Facility, Portland TX
    2 miles of 12 inch to Marathon in Garyville LA
  • Test, rehab, and place in service, 12 miles of 8 and 12 inch gas pipelines in Harris County, Texas
  • Install two 16 inch lines with directional drills in Pasadena, Texas
  • Install 5 miles of 12 inch line, and commission Butane Blending Facility in Kansas City, Kansas
  • Install 5 miles of 20 inch line near Wichita, Kansas
  • Test 11 miles of 12 inch pipeline in the Woodlands, Texas
  • Test 66 miles of 6 inch pipeline from Houston to Sheridan, Texas
  • Install 24 inch piping and meter station in Yscloskey, Lousiana
  • Fabricate and install meter station in Bedford, Indiana
  • Install 8 miles of 8 inch pipeline with 3 directional drills in Mont Belvieu, Texas
  • Relocate 6,000 feet of 8 inch pipeline in Exxon Corridor 70 in LaPorte, Texas
  • Install three 6 and one 8 inch pipeline with directional drills and stations in Pasadena, Texas
  • Install 6 and 8 inch pipelines with directional drills and stations in Ghent, Kentucky
  • Install 20 inch HDPE pipelines in Exxon Corridor from Air Liquide Plant to Akzo Plant in Baytown, Texas
  • Install 20 inch HDPE CO2 pipeline underground through Sun Refinery to Air Liquide Plant in Toledo, Ohio
  • Install Trinity River crossing by directional drilling and remove suspension bridge in Liberty County, Texas
  • Replace 6 inch crossing by directional drilling of Cache Creek in Wichita Falls, Texas
  • Install 5 miles of 16 inch pipeline in Channelview, Texas
Get in touch

We’re excited to work along side you and grow your business!